Wednesday, April 16, 2014

Bathroom remodel - things get worse before they get better!

As the old saying goes, things usually get worse before they get better.  That's especially true when remodeling.  The old hall bathroom was ugly enough that I did not even want guests to visit.  How sad is that?  So I was excited to start the remodel, because that meant that things were going to get better.  But oh, the in between....construction materials everywhere, dust everywhere, exposed pipes, trash, bathroom things in the guest room, topsy turvy madness.  I really kept repeating the mantra:  "Things get worse before they get better - better is on the way!"  We finished the bathroom in about 5 weekends of steady work.  Not too bad, all things considered.  We survived, and now we have a bathroom that I encourage my guests to visit.
The pocket door is installed where the wall used to be.  This was a kit we bought that allowed us to modify the existing door.
The shiny, beautiful new tub.  I was so excited about the tub.  The old one had been painted pink, then painted cream, had patched holes, and so much built up grime I could never get it clean.  I took one shower there and felt dirty afterwards.
After the tub was installed and the pocket door was up, we replaced the old surround with cement board and tile.  Cement board is much heavier than sheetrock, and better suited for tile in a wet area.  If cement board gets wet, it gets harder, and is extremely resistant to mold or mildew.  We decided that in case of an earthquake, we want to be in this room!  We cut in a spot for an inset where shampoo can sit. 
Here we are dry fitting the tile for the shower surround.  We selected a rectangular ceramic tile for the shower.  The accent tile is natural stone and copper.  It set off the bronze fixtures we selected perfectly!  I do all the tile work with Jay assisting.  He makes most of the cuts and encourages me when I start using foul language. All the tiling was completed in one weekend.
If I had to pick one part of remodeling I hate the most, it's probably plumbing.  I have watched and assisted Jay in plumbing so many times now, and it really seems that it is as much an art as a trade.  We also had a diving buddy who is also a general contractor visit while we were working.  He said that it looked pretty good for a homeowner DIY - so we consider that a compliment. 

So behold the finished product!  A bathroom that I am enamored with.  I am so pleased about how our choices on fixtures and tile seemed to come together.
We installed a pedestal sink to have more floor space.  To make up for the loss of the vanity and the medicine cabinet, we put a cabinet above the toilet.  The toilet is the same one we had before, just cleaned up.  The wainscoting was all replaced, as was all the trim.  The floor tiles are 18 x 18.  The color on the walls is Toffee by Behr.  We chose oil rubbed fixtures for everything, including the outlet and switch plate covers. 

I think the tile job turned out pretty well if I do say so myself!  The inset was tiled with floor tiles to tie the two together.  The accent tiles go nicely with the oil rubbed bronze fixtures we chose for the tub (the fixtures are Delta Porterfield).  And the tub.... it just shines.  I smile every time I walk past this room.

Monday, January 20, 2014

Goodbye to the old, icky hall bathroom

Over the holiday break, we started getting serious about our house renovations.  We bought the house knowing that for many things, we could wait.  We wanted to paint, and get things unpacked, organized, and settled before we tackled the things that we knew we wanted to change.  Just to put it in perspective, this property was for many years a rental property.  When work was needed, the owners went with the least expensive option for everything.  The couple who owned it before us did quite a bit of work- new wiring, new fences, new flooring, remodel of the master bath, and so on.  However, they did not get to everything, as is often the case with a home in progress.  This left us with a few rooms that needed to be remodeled entirely, and some things we just want to make ours, so to speak. 

To kickoff our projects, we built a small wall along the left side of our driveway.  We planted azaleas, and Jay put in a drip hose for irrigation.  It looks very nice now that we have two walls on each side of the driveway.  The entire project took one weekend, and was very satisfying.  We were ready to tackle the next project, which was going to be a little bigger....the complete gutting of the hall bathroom. 

Some of you may remember our previous home in Massachusetts.  That house needed a lot of TLC...especially the bathroom.  However, I think we managed to take it from a dim, water damaged, out of date hole to a bright, updated, solid new bath.  Well, the good news is that our current bathroom was in no where near as bad a shape as the bath in Massachusetts.  For instance, the lights worked on a daily basis, I never fell through a wall, and it didn't smell of pee constantly.  However, it was not in great shape.  The tub and shower surround were plastic, and old, with pink showing through where the plastic had worn thin.  The vanity appeared new, but didn't work in the space for us.  The linoleum, while not a bad choice, was so dirty I couldn't get it clean, the wainscoting was water damaged, and the walls and ceiling needed paint.  All the fixtures needed to be updated.  We also decided to turn the door into a pocket door to save floor space (the bathroom is very small).  Here's our plan:
  • Remove the old wainscoting, vanity, and tub
  • Change the door to a pocket door with a kit
  • This will mean some shifting of the plumbing and electrical (nothing Jay can't handle)
  • Paint walls and ceiling
  • Install new tub
  • Tile the tub surround and floor
  • Install new wainscoting and trim
  • Put in a pedestal sink
  • Install new light fixture, tub, and sink fixtures
Luckily, our new home has two bathrooms, so we don't have to get the work done in a single week.  We made a great start this weekend, performing all the demo work, installing the pocket door, painting the ceiling, and moving the electrical and plumbing.  We will next install the new tub, repair/replace the sheetrock where needed, and prepare the surfaces for tiling.  Below are some of the before pictures, and a photo of the pocket door installation. 
Jay is excited to get started being handy.  He's removing the old vanity here.  It will be replaced with a pedestal sink.

The tub was old  and patched, and so stained I could never get it cleaned.  Same for the floor.  It's a cheap plastic tub, and we are replacing it with a steel tub.

You can see the tracks for the pocket door here; Jay has now installed the door, moved the electrical, and finished the plumbing.

Tuesday, December 31, 2013

The First Christmas in Casa de Hall

This year will be our first Christmas in the new house in California.  It was an eventful holiday season for us.  We moved into the house in October, and then traveled for a week at Thanksgiving to visit family on the east coast.  A week after returning, I left for Italy for a few days on a business trip.  Jay and Meow held down the fort while I was away.  We had put up the tree before I left, but Jay hung the outside lights to surprise me when I got back. 
Jay wore his new antlers and made egg nog to enjoy while decorating the tree.

The finished tree!  We listen to Christmas carols and drink egg nog while we decorate.  Each ornament is from a trip we've taken together.

 We ran the Santa Monica-Venice Beach Christmas 5K, and that was an adventure - if you saw the pictures on Facebook, you know that we were drenched.  It only rains in the winter in Southern California, and that day was the lucky day.  Not so lucky for us.

My nutcracker collection continues to grow.

My Christmas carousel from Germany.

Even the entryway got a little snazzy!


We really enjoyed being in our cozy little home for the holidays.  The nice thing has been the two week stay-cation I got this year.  We have taken advantage of this time to put in a new wall on the driveway, clean out the garage and organize it, work on the lawn, and begin planning and prepping for the hallway bathroom renovation.  I am very grateful our house has two bathrooms, so we don't have to rush with this bathroom remodel. 


Sunday, October 20, 2013

Casa de Hall - the before shots

This week marks our first week in Casa de Hall!  It has been a busy, busy time.  If you are curious about our new home, here are the shots I took before we painted and moved in.  You can see some pics of color swatches we were comparing to make our choices.  First of all, here's the front door. 
Front entrance to Casa de Hall, Thousand Oaks, CA.  The window on the left looks into the garage.
One of the first things Jay did was empty the garage completely and epoxy the floor.  He did a great job!  I could hardly believe how nice it looked when he finished.
The newly epoxied garage floor, after the appliances were returned. 
The garage enters straight into the kitchen.  It will eventually be completely gutted and remodeled, but that will be a little while in planning and saving.
The kitchen, before....
Immediately to the right is the living room.  One of the first things we did was paint the entire house.  Most of the rooms were a rather pale green, and we wanted something much warmer.  We also painted all the ceilings.  A fresh coat of bright white on the ceiling always adds polish!  The wall separating the kitchen and living room was going to be painted a rich brown...  Every room has a ceiling fan, and recessed lighting.  Jay was also wiring the living room for surround sound.
The living room.

The accent wall, wonder which shade we chose?

The living room leads to a hallway, and that's where the hall bathroom is.  It will be the first room to be remodeled, this December.  We will be putting down a new tile floor, pedestal sink, new tub, and tile surround for the tub.
Hall bathroom, before.
The guest room is right across the hallway, and the office is at the end of the hall.  At the end of the hall to the left is our master bedroom and bath. 
The master bedroom has a door onto the backyard. 

The master bath has a stand up shower.  It was also painted green, but we wanted a new color to accent the marble countertop.
The house has a fully fenced in backyard, with a brick patio and a retaining wall.  We have big plans for the landscaping!
The side of the house next to the kitchen.  A slider opens onto the patio.  The door you see leads into the garage.

The backyard has a retaining wall, and brick patio.

The other side of the yard.  There's a sprinkler system, but we're not entirely sure how to work it yet...
I hate trying to envision the layout of people's homes just by a verbal description.  And Jay and I had wanted to be sure we could fit in our furniture.  So we bought some software that allows us to build our home virtually.  We can design the new kitchen and bath, and our landscaping.  But here is a layout of the house.
Coming up next - the house after we've moved in!

Monday, September 16, 2013

It's almost official!

There are three big things happening in life for us right now.  The first?  Our house!  Escrow is set to close tomorrow.  We have some work to do at the house before we move in.  It's in rather good condition, but it needs to be painted, cleaned, the garage set up to our liking, etc.  The home has been a rental property for a few years, and while move-in ready, there are some upgrades we will make over time.

Right now we are planning to move midway through October.  That gives us a month to perform the painting, then pack, and follow that with the move and unpacking.  I am planning to take some pictures before we move in, so we can share our progress here as we make our upgrades.  Here are some of our more long-term plans:

  • Renovate the guest bathroom:  We will do this ourselves, adding tile, putting in a new tub, tiling the walls, and putting in a new pedestal sink to replace the older vanity.  This will be happening in December.
  • Put down new hard-wood floors - no time set yet.
  • Fully renovate the kitchen - this one will be pretty extensive, as we have several major changes we would like to make if possible.  We will be saving our pennies to hire a contractor and have the job done properly.  No time set yet, probably two years.
  • Paint the outside of the house, replace the back screen door, and replace the front outside light.  Probably early next summer?
  • Landscaping - this one requires almost an entire post of its own.  In the front, we will be adding trellises with jasmine, and some plantings in the front bed, as well as staining the retaining wall.  In the side, we will be added a gate and a pergola over the seating area, and installing Meow's fountain and custom catnip garden, and a kitchen herb garden.  We will be raising the bed and staining the concrete.  In the backyard, we are going to replace the existing wood retaining wall with stone, build a pergola over the existing patio, add a raised vegetable bed, put in a new walkway, and set up some nice plantings on top of the retaining wall.  Maybe add a small storage building if needed.  We will do this as we can, and put in a more defined timeline later.  
The second thing keeping us busy is Divemaster training.  We passed our exam, and are now in the midst of our qualifications for skills.  Then we have practicums and all the dives we need to complete.  I hope to have this complete by end of Q1 2014.  

The third thing, as always, is work and our professional commitments.  Things are busy, busy, busy at Amgen - for very good reasons.  And my new position is incredibly challenging and engaging.  I am a biologist working in engineering; quite the change.  It is really challenging my very rusty calculus skills.  I'm also hoping to finish up a paper with my post-doctoral lab, and I am serving another year as AWIS LA/VC chapter president.  Jay is really pushing himself with his writing, and while he is not pursuing it as heavily as he originally intended, he still has photography work he is handling.  Plus his required stay-at-home husband work...

We are still trying to make time for fun things.  We went to the LA County Fair in Pomona this weekend.  We walked through as many exhibits as we could, and really marveled at what beautiful things people can make.  It was fun to hold hands, watch the lights and the people screaming on the rides, and smell the fair.  We of course had funnel cake.  We also took a wine tasting class, on the joys of red wine blends.  It was a good weekend.  The next ones will not be quite so colorful, since we will be spending those painting and packing, but I am committed to enjoy the process and remind myself that everything takes its allotted time.  

Friday, August 16, 2013

Where have we been lately? Well....

We have been underwater, of course! We are now far past where we were a year ago.  We are completing our Rescue Diver certification course this weekend.  Next up, Divemaster.  After that, well, I think we might just enjoy the diving.

We've been working!  I am settling well into my full time position at Amgen, learning lots about process development and engineering.  It's been a big change, but it has gotten better and better with time.  Jay has made the biggest move of all this year in regards to working.  He left Ricoh in January, one week after my position started at Amgen.  He's been a freelance writer and photographer ever since, and amazing me with how hard he can work at home.  The boy has focus, that's for sure.

We have been enjoying life in the suburbs!  Since our move to Thousand Oaks in December of 2011, things have been very quiet.  We are living in a two bedroom townhouse with wonderful cathedral ceilings, a courtyard complete with water fountain and catnip garden, and a big back patio.  It is a beautiful, relaxing place for us, and for Meow.

We have been traveling!  We've been to Cozumel, Mexico for a dive trip organized by the TO Dive Club.  We've been to the central coast and Ojai.  We've been to Las Vegas.  Of course, we've also been back to Georgia to see family.

We have been house hunting!  And now, finally, we may have found the One.  Our new home in Thousand Oaks, Casa de Hall.  Stay tuned....


Sunday, October 14, 2012

Catalina Island

Wow!  Behind again - I promise, it's just because we are having so much fun.  Jay bought me a Roomba for our anniversary, so that should free up some time to post more.  :)  My birthday was a month ago, and I am just getting around to posting some pictures. 

We decided for my birthday weekend this year to go to Catalina Island, and, yes, go diving.  I believe for the next few months you should just consider this blog a run down of our diving adventures.  We took the afternoon ferry over on Saturday, and stayed at the Hotel Atwater.  That evening we strolled through Avalon, and had dinner at Armstrong's.  We went to bed early, since the next day would begin early. 

Our diving master and instructors took the first ferry over the next morning, and we met them at Casino Point.  The old casino in Avalon is built right on the water, and now overlooks a dive park preserve with some of the best diving I've experienced in California.  It was lovely.  We were able to get in three dives that day.  The video below was taken during our Fish ID dive - we are working towards our Advanced Open Water certification, and this was one of our skills.  The large orange fish you see are called Garibaldi.  The spotted ones are kelp bass.

That evening we rented a golf cart, and drove into the hills surrounding Avalon to get a better look at the scenery from above. 
The golf cart driver, and photographer.  I grabbed the camera for this shot.
The view of Avalon bay from the hills above.
That evening we celebrated with dinner at The Landing.  We watched the sun set over the water and enjoyed a delicious dinner.  The next morning we had time for breakfast and a quick walk along the water front to the casino before we caught the last morning ferry back home.  We will need to return to Catalina soon for a much longer visit!